نتایج جستجو برای: economic lot scheduling problem

تعداد نتایج: 1248253  

Journal: :Computers & OR 2003
Yi Xu Bhaba R. Sarker

Article history: Received 1 August 2011 Accepted 28 October 2011 Available online 29 October 2011 Recently, the economic lot scheduling problem (ELSP) with common cycle time and shelf life restrictions has attracted the attention of several researchers. In this paper, a comparative study of solutions given by Xu and Sarker (2003) [Computers & Operations Research 30 (6), 925938] with the results...

Journal: :European Journal of Operational Research 2011
Erik M. M. Winands Ivo J. B. F. Adan Geert-Jan van Houtum

We consider the production of multiple standardized products on a single machine with limited capacity and set-up times under random demands and random production times, i.e., the so-called stochastic economic lot scheduling problem (SELSP). The main task for the production manager in this setting is the construction of a production plan for the machine that minimizes the total costs, i.e., the...

Journal: :روش های عددی در مهندسی (استقلال) 0
فریماه مخاطب رفیعی و محمد معطر حسینی f. mokhatab-rafiei and m. moattar hosaini

this paper considers the economic lot scheduling problem, that is, the problem of scheduling several products on a single facility so as to minimize holding and setup costs. combination of frequency and timing as well as production quantity make this problem np-hard. a heuristic is developed to obtain a good solution to elsp. the proposed heuristic makes use of the simulated annealing technique...

Journal: :Bulletin of the Australian Mathematical Society 1981

Journal: :European Journal of Operational Research 2011

2004
Guillermo Gallego

Economies of scale often dictate the choice of a single high speed machine capable of producing a given set of items over the choice of one dedicated machine for each item in the set. A scheduling problem arises when the high speed machine can only produce one item at a time. The problem is further complicated when the machine needs to be setup (often at a cost of both time and money) before a ...

Journal: :International Journal of Production Economics 2009

Journal: :Computers & Industrial Engineering 2012
Simone Zanoni Anders Segerstedt Ou Tang Laura Mazzoldi

In this research we study the multi-product economic lot scheduling problem (ELSP) with manufacturing and remanufacturing opportunities. Manufacturing and remanufacturing operations are performed on the same production line. Both manufactured and remanufactured products have the same quality thus fulfil the same demand stream. Tang and Teunter (2006) firstly studied this type of economic lot sc...

Journal: :international journal of industrial engineering and productional research- 0
m. heydar b. karimi s.a torabi

the problem of lot sizing, sequencing and scheduling multiple products in flow line production systems has been studied by several authors. almost all of the researches in this area assumed that setup times and costs are sequence –independent even though sequence dependent setups are common in practice. in this paper we present a new mixed integer non linear program (minlp) and a heuristic meth...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید